3D A Must


Above is the layout we produced for a plant room at Dedworth School. Other than the Contractors preference to change the location of the gas supply to the boiler skid, the installation was virtually a carbon copy of the design. The use of Revit is essential in producing layouts for ever decreasing plant spaces and is an option that we now employ as standard.

17 views1 comment

Recent Posts

See All

Appointment

Great news having been appointed for the design for the replacement of the LTHW and Chilled Water infrastructure at a high end residential building in St John's Wood. Will need to be looking for bespo