Above is the layout we produced for a plant room at Dedworth School. Other than the Contractors preference to change the location of the gas supply to the boiler skid, the installation was virtually a carbon copy of the design. The use of Revit is essential in producing layouts for ever decreasing plant spaces and is an option that we now employ as standard.